Main Office & Wailuku Branch at Kehalani Village Center

Headquarters Update

Maui County FCU's new main office and Wailuku Branch will replace the Wili Pa Loop location. The new 26,100 square foot location will feature a drive-up ATM, safe deposit boxes and a community room. When completed the building will be able to accommodate up to 90 employees and have ample parking with 130 stalls. This new building will enable us to be more efficient in serving our nearly 20,000 members, allow us to centralize our consumer loans and human resources personnel who are currently housed in a separate location, and position the organization for future growth.

August 25, 2022

Branch Interior

Exterior walls are being finished, work on the parking lot has started and the first coat of paint is on the interior walls. We've been impacted by supply chain and labor shortages like everyone else. Anticipated opening is looking more like January 2023.

July 22, 2022

Exterior Wall Coating

Concrete coat on the exterior walls of the building is going on while interior walls are being painted, tile work is being done in the restrooms, AC duct work is nearing completion. We're looking forward to being able to serve you here by year end.

July 8, 2022

Exterior Glass is In

The interior is taking shape with exterior windows and doors installed. We're shooting to be substantially completed in October, however with supply chain and labor shortages, it's a moving target.

May 26, 2022

Community Room

Our new building will also include a community room with meeting spaces for up to 100 people. In addition to being able to hold all our employees for training sessions, the room will be available to community organizations.

May 11, 2022

Walls are Going Up

Dry wall is going up and window frames are going in. We're facing labor and supply chain shortages like everyone else, but we're still making progress. Hoping to begin serving our community at this location in late fall.

March 11, 2022

Building Topped Off

With the roof of our future main office and Wailuku branch at Kehalani Village Center done, we celebrated the topping off of the building by thanking the contractors and construction workers. 

January 12, 2022

On the 3rd Floor

What's happening on the 3rd floor... flooring is in and exterior walls are up. This floor will house the AC units and storage. Watch this video to peep the views from above.

December 17, 2021

Roof Framed

Steel framing for the roof is nearly complete despite the rain days. Next up is the plywood roof then the water shield. Hoping to top of the building in February 2022.

November 9, 2021

Birdseye View

Checkout this aerial video of the construction site shot by our Project Manager, Will Morrow. Shows the immense amount of steel going onto the rooftop and progress from above.

September 31, 2021

2nd Floor Poured

A huge mahalo to the crew that poured the slab for or second floor. Down below another crew is working on installing the sprinklers on the first floor.

September 18, 2021

2nd Floor Progress

The steel deck pan for the second floor is nearly completed and ready to prep for the concrete pour. Third floor steel deck pan is also going in.

August 29, 2021

Last Beam Installed

The last steel beam for the framing of the building has been signed and in lifted by crane into place. Mahalo to all of the welders who've been working on the building framing.

July 14, 2021

Vault Delivered

The vault has been unloaded panel by panel and installed. This location will offer members three sizes of of safe deposit boxes.

June 18, 2021

Foundation Poured

The Concrete foundation has been poured and is curing. Thank you to all the concrete masons who were up at 2am to get the pour completed in a single day.

February 28, 2021

Retaining Wall Done

The retaining wall is up. CEO and President, Gary Fukuroku, and Vice President, Michele Kawahara, are pictured standing in front of the wall for scale.

January 31, 2021

Grading Beings

Grading work of the site is underway with the big machines being brought in for the heavy work. We love seeing our members helping to build our future home. Keoki's the one operating the huge excavator! 

December 9, 2020

Groundbreaking

Maui County FCU broke ground on the future site of our new headquarters and Wailuku Branch in Kehalani Village Center. The building is anticipated to be completed in mid-2022.